Flood Protection
Info advantages
Flood Protection System is an innovative and effective solution which is easy to transport and install. Depending on the needs and water rise Protan-Elmark is able to prepare individual design and deliver a flood barrier to given place. Flood Protection System is an alternative to traditional methods like sand filled bags.
Assembly
350 people are needed to create 100 meters of flood barrier in 2 hours by using traditional methods. We only need 2 men to do the same when we use the Flood Protection System.
Time
Setting of one module of flood barrier only takes 20 minutes. This is the time which Flood Protection System needs after it is connected to a motor pump to fill with water and create 10-meter long protection of destination stacking of water up to 60 cm. A filled module is not only equiped with integrated valves to fill and empty the module, but also with a special connector which allows connecting several modules.
Transport
Thanks to the fact that Flood Protection System is very easy to transport 47 trucks can be replaced by one car with a small trailer.
Performance
14000 bags of sand is equivalent of 10 modules od Flood Protection System.